Create a planning allowance for earth rods, spacing and earth-lead length based on energizer size class and soil condition. Final earthing must follow the energizer manufacturer, earth testing and local requirements.
Enter the site/project values below.
Enter your values and calculate.
Use these results for planning and verification, then confirm against the actual equipment and site.